Dinamap Pro 100V2 Wartungshandbuch Seite 77

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 104
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 76
Revision A PRO 100-400 V2 Patient Monitor Service Manual 4-25
2009829-001
Calibration & Maintenance: SECTION 4. GENERAL MAINTENANCE
4.8. ELECTRICAL SYSTEM SAFETY CHECKS
The PRO Monitor is designed to protect the patient from electric
shock. To ensure the integrity of these safeguards, use a safety
analyzer to perform the following leakage current tests. These tests
should be performed on every unit whenever the case is opened
before it is returned to clinical service. If any reading exceeds the limit
specified, do not return the unit to clinical service.
Ground Leakage
Measure ground leakage current with normal polarity, reverse
polarity, and open neutral. Limit is 500 µA.
Temperature System Leakage (PRO 200 & 400)
Set your analyzer to measure leakage current with mains voltage
applied to the test probes. Use a temperature plug with the leads
shorted and apply the test probe of the analyzer to the leads. The
leakage reading should be less than 150 µA.
SpO
2
System Leakage (PRO 300 & 400)
Set your analyzer to measure leakage current with mains
voltage applied to the test probes. Use an SpO
2
plug with the
leads shorted together and apply the test probe of the analyzer
to the leads. The leakage reading should be less than 150 µA.
Seitenansicht 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 103 104

Kommentare zu diesen Handbüchern

Keine Kommentare